What We Do

Engineering & Manufacturing Capabilities

Organized in the order a client package moves through CNI, from mechanical engineering and procurement to loadout. Site construction and commissioning are included where the project scope calls for them.

Step 01

Mechanical Engineering & Analysis

Detailed mechanical engineering and analysis turn the client’s specification into fabrication drawings and calculations.

  • Detailed mechanical engineering
  • 3D modelling
  • Vessel thickness calculations
  • Pipe stress and nozzle load analysis
  • Finite element analysis

One representative drawing or 3D model.

Large steel tubulars stored in the workshop with workers for scale
Step 02

Materials & Procurement

Procurement follows the project specification and its material requirements, from common carbon steels to corrosion-resistant alloys.

  • Carbon steels
  • Stainless steels
  • Duplex and super duplex
  • 6Mo
  • Nickel alloys
Operator at an automatic welding station on a large vessel head
Step 03

Heavy Fabrication & Specialized Welding

Heavy plate forming and thick-wall fabrication, with specialized welding processes for demanding service. For the Mill Creek steam drum, hot shell rolling and hot head forming produced a 136 mm shell to ASME Section I.

  • Heavy plate forming
  • Thick-wall fabrication
  • Corrosion-resistant weld overlay, including electroslag overlay
  • Post-weld heat treatment in a 23 m-long furnace chamber
Integrated skid package with structural frame, vessels and piping
Step 04

Modular Assembly & Integration

Vessels, piping and frames are assembled in the workshop, with electrical and instrumentation installation where specified, so packages arrive on site as complete units.

  • Vessel, piping and frame assembly
  • Electrical and instrumentation installation where specified
  • Shop testing of the assembled package
Heat treatment furnace building with a large vessel in front
Step 05

Inspection, Testing & Finishing

Inspection and test plans, third-party examination, hydrostatic testing, coating and final documentation, as applicable to each package.

  • Inspection and test plans
  • Third-party examination
  • Hydrostatic testing
  • Blasting and painting in two booths
  • Final documentation
Two integrated skids loaded on a barge
Step 06

Heavy Loadout & Delivery

The shipping configuration sets how much of a package can be completed in the shop. From the waterfront loading area, equipment of up to 120 m in length or 1,000 tonnes transfers by barge to an export port.

  • Published length maximum: 120 m
  • Published weight maximum: 1,000 tonnes
  • Barge transfer to an export port

Planning a package?

Send us an equipment list, datasheet or preliminary scope and our team will review it with you.