Fabricated piping assemblies on transport trailers
Malaysia · 2024 reference

Shell Rosmari Marjoram Onshore Plant / Platform, Piping and Steelwork

Fabricated piping ready for transport.

CNI's scope

CNI fabricated the platform, piping system and steel structure package for the onshore gas processing plant in Bintulu, Sarawak: approximately 450 tonnes of fabricated components.

Split of the package between steelwork and piping, and a photograph showing the steelwork.

Technical highlights

~450 t
Fabricated components
SA516-70 · A285 · SUS316
Materials

Discuss your project

Planning a comparable package? Send us your equipment list or preliminary scope.